SafeHire NC is in public beta — help us break it. Send feedback

Critical Path Electric, LLC

License Qualifier(s): Mark Andrew Harrison

The examination credential holder(s) of record with the state board — not necessarily the business owner.

Phone: (919) 605-0037

County: Wake

Address:
2813 C Okelly St
Raleigh, NC 27607

Address per state licensing records. Some businesses register a mailing address. Own this business? Use Report Issue to request a correction, or to ask us to withhold your address or phone number.

🛡️ Trust & Verification

Corporate Status (NC SOS) Unverified
Workers' Comp Insurance Unverified
OSHA Safety Check Unverified

What this contractor is licensed to do

Based on the license(s) below that are currently in good standing with the state. Describes legal authority only — not insurance, workmanship, or availability.

Unlimited electrical
Any electrical project, no dollar limit — residential, commercial, or industrial.

Not sure what these mean? Read the license decoder →

State Licenses

License # Qualifier Type Status Expiration Last Checked Official Board
U.23696
Raleigh
Mark Andrew Harrison Active 2027-02-20 Sep 1, 2026 Verify Report to Board

Board records last checked: Sep 1, 2026

License data is collected from official NC licensing board records and may lag behind the boards' own systems. Always confirm current status directly with the issuing board before hiring. Spot an error? Use the Report Issue button above — we review every report by hand. Full data disclaimer

Professional Associations

No known association memberships found for this location.

Is this your business?

Verified badges are launching soon — join the launch list and lock in founding-member pricing.

Join the Launch List